ABOUT Rs ASSOCIATES

Design, Detailed Engineering, Troubleshooting, Equipment Supply, Construction, Installation and Commissioning solutions for Ferro Alloy plants and Submerged Electric Arc Furnace projects.

ENGINEERING EXCELLENCE & INDUSTRY POSITIONING

To scale the heights of excellence and provide best-of-breed Design, Detailed Engineering, troubleshooting solutions, and superior quality Smelting technology for the Ferro Alloy Industry, Rs ASSOCIATES entered the Ferro World with wide experience and expertise in designing and installation with latest concepts.

Rs ASSOCIATES has an expert team in Design, Detailed Engineering, Troubleshooting, Installation and Commissioning of Submerged Electric Arc Furnaces (SAF) for the production of Ferro Alloys, managed by a group of well-experienced experts in the field of Design and Execution of projects since the last two decades.

Founded by Mr. Ramesh as a proprietary firm in December 2011 in Visakhapatnam, Andhra Pradesh, Rs ASSOCIATES caters to Ferro Alloy plants, rolling mills, briquetting plants, and sintering plant units. Mr. Ramesh is an Esteemed Member of Institution of Engineers (MIE), Chartered Engineer [C Engg(I)], Fellow in Institution of Valuers (FIV), and Competent Person under the Factories Act in Andhra Pradesh.

Rs ASSOCIATES Engineering Execution

KEY HIGHLIGHTS

  • SAF Design Experience Range: 2.60 MVA to 30.00 MVA
  • Products: HC FeCr, HC FeMn, HC SiMn, FeSi, Pig Iron
  • Concept to Commissioning end-to-end execution
  • Micro-level project monitoring & quality control
  • Precision Electrode Assembly component fabrication
  • Project experience across India, Oman, Zambia, Dubai, Bhutan, Georgia, Bangladesh, and Egypt

Milestones of Engineering Excellence

  1. 2011
    Founded
    Organisation Founded • 2 × 9.0 MVA furnace project.
  2. 2017
    Equipment Supply
    First Furnace Equipment Supply Order.
  3. 2019
    First EPC
    First EPC Order.
  4. 2021
    Export EPC
    Second EPC Order — For Export.
  5. 2022
    Major Design Orders
    4 × 22.5 MVA + 4 × 33 MVA.
  6. 2023
    EPC Order
    2 × 36 MVA.
  7. 2025
    Design & Furnace Equipment
    • 2 × 51 MVA design order and furnace equipment.
    • First Indian company to introduce an LT compensation system.
    • Power generation using WHRB.
  8. 2026

MULTIDISCIPLINARY ENGINEERING TEAM

Mechanical Engineering

Lead: T. Ramesh, M.Tech

5 Mechanical Technocrats specializing in plant layout, equipment sizing, and structural integration.

Electrical & Instrumentation

Lead: P. Srinivasa Rao, M.Tech

Transformers, high-current busbars, control panels, and automated furnace instrumentation.

Civil & Structural

Lead: Dr. K. Srinivasa Rao, Ph.D (AU)

4 Civil Technocrats for heavy furnace foundation, multi-story plant building, and steel structures.

Metallurgical Consultancy

Lead: C.S.S.R. Varma (40+ Yrs Exp)

Smelting process optimization, raw material blend advice, and furnace performance tuning.